Red Line North

The Red Line North Underground is part of the Doha Metro system, extending for a length of approximately 13km through seven underground stations.

The project includes excavation of two tunnels (one in each direction), each approximately 11.6km long and seven underground stations. Starting at Musheireb and completing at Doha Golf Course (via Doha West Bay).

Statistic 1
2 x 11.6km underground tunnels
Statistic 2
Over 30.000 assets to modelled and integrated with the chosen Facilities Management software
BIMTEC was appointed to provide As-Built BIM Models enabled for asset management purposes, reflecting Qatar Rail Facilities Management and Asset Information Modelling requirements. The scope of works for BIMTEC was the entire underground track areas.