Ras Abu Aboud Stadium

Ras Abu Aboud Stadium and Precinct is one of the venues to host 2022 FIFA™ World Cup matches up to the semi-finals stage.

The Stadium, constructed to meet FIFA standards for the tournament, will reach completion in 2020. It is located at the waterfront site on Doha’s shore, whose shipping containers echo the aura of the nearby port.

Situated just 1.5 kilometers from the city’s state-of-the-art Hamad International Airport, it is designed using modular building blocks, each containing removable seats, concession stands, lavatories, and other fundamental stadium elements. The Ras Abu Aboud aims to revolutionize tournament experience with legacy planning.

Statistic 1
Located on a 450,000m2 waterfront site on Doha’s shore
Statistic 2
40,000-seater capacity
Statistic 3
About 1000 prefabricated shipping containers as the most unique concept design to any World Cup Stadium ever made.
BIMTEC have been assigned by HBK Contracting Company, the main contractor of Ras Abu Aboud Stadium and Precinct project to manage and provide solutions to all BIM and Coordination related scope inline with the Supreme Committee (SC) requirements. These requirements include reviewing and auditing the design models deliverable by design consultants, providing coordination and clash detection services between all disciplines, 4D/5D, COBie, tagging assets, and providing As-Built models LOD500 with drawings via the use of laser scanning. BIMTEC also represents HBK for the overall BIM management during the design and construction phases through the BIMTEC on-site management team and provides the shop drawings and LOD400 models for all disciplines through the BIMTEC technical off-site team. Other services include laser scanned surveying, laser scanning technologies employed for recording As-Built elements and verification against BIM construction models, as well as reporting deviation point clouds against 3D Models.