Information

Orbital Highway

The Project is located west and south of the Doha city and provides the New Orbital Highway connecting Mesaieed to Salwa Road.

The major elements are 57 Km of roadworks with five main interchanges (30 km of 14 lanes Orbital Highway / 27 km of 8-16 lane side roads, four Grade-separated cloverleaf type interchanges and one grade-separated junction comprising 24 bridge structures.

There are 18 braiding and emergency exists, pedestrian & bicycle paths with appropriate underpass structures, new utilities such as surface drainage works, TSE Lines, Electrical Works, Street lighting works, Q-Tel, QAF, ITS Ducts, diversion and protection of existing Utilities (including QP gas pipelines), crossing points of EHV pylons and landscaping (within interchange).

Statistic 1
1.7 Billion USD
Statistic 2
57 Km of roadworks
Statistic 3
5 Main Interchanges
BIMTEC provides laser scanning and surveying technologies to support logistics during the construction stage. BIMTEC has developed a live workflow to report the production of stockpiles for the several production areas of the highway, based on advanced scanning technologies and 3D modelling techniques.